Corhydrae Posted June 19, 2018 Share Posted June 19, 2018 I've been merging the land and growing it past lvl100 when I built the solar panel, but the panel is still only lvl1 l. The land is way past lvl100 now. Am I missing something? Quote Link to comment Share on other sites More sharing options...
0 Ruvox Posted June 19, 2018 Share Posted June 19, 2018 You only upgrade utility structures like the solar panel if you hit the capture button at least 50 meters close to that structure (I've noticed that about 75 meters is still enough but constantly hear it would be 50 meters). The utility structure level has nothing to to with your lands level which has to be at least 100 to place utility structures on it. So you have to stand near the solar panel and capture there to upgrade it 1 Quote Link to comment Share on other sites More sharing options...
0 Corhydrae Posted June 19, 2018 Author Share Posted June 19, 2018 1 hour ago, Ruvox said: You only upgrade utility structures like the solar panel if you hit the capture button at least 50 meters close to that structure (I've noticed that about 75 meters is still enough but constantly hear it would be 50 meters). The utility structure level has nothing to to with your lands level which has to be at least 100 to place utility structures on it. So you have to stand near the solar panel and capture there to upgrade it Thanks! It worked! I'm happy Quote Link to comment Share on other sites More sharing options...
Question
Corhydrae
I've been merging the land and growing it past lvl100 when I built the solar panel, but the panel is still only lvl1 l. The land is way past lvl100 now.
Am I missing something?
Link to comment
Share on other sites
2 answers to this question
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.